Switching to solar is easy

Meet the Eden Global Solution 360° Process

1. Free online consultation

Once you request an estimate, our team will provide you with a complete quote and set up an on-line or call with your team to discuss your energy needs, system symptoms and answer all of your questions.

2. Onsite evaluation

Our team will visit your company to measure, collect data and analyze it to determine what is the best system's design that will produce the maximum amount of energy.

3. Revised quote

Our team will provide a revised quote based on the site visit evaluation. Once you review it and release us to proceed with the project, the equipment is sized and selected.

4. System engineering and design

After the equipment is sized, our team will engineer and design the system to customize your needs. We’ll send you the design for your review and agreement. Once you agree, the equipment is ordered for site delivery.

5. Construction and installation

Once equipment is delivered, our expert crew will begin installation. The average time for installation is 1 to 2 months depending on the size of the system.

6. Commissioning of system

Once the requirement is installed, it takes between one day to one week to comission the system.

7. Operation and maintenance

Our team will continue to monitor and maintain your system to ensure optimum energy production.

How long does the process take?

The total installation process will take between 4-6 months from the time of approval for projects between 250kw to 500kw. For projects from 500kW up to 5MW it will take a few more months.

The process is simple and in less than 12 months you can have your system installed and start saving money.

What are you waiting for? Start saving your hard earned business money.

Can I get depreciation credit on new installation of Solar Panel?

Yes, depreciation on solar panels offers an excellent means for business and farms to offset the cost installing solar systems speeding your ROI.

Apply for solar financing in RD